The building in question is the subject of architectural intervention - reconstruction.
This building is currently used as a commercial building.
By architectural appear in a miserable situation and inappropriate to its function being hampered commercial and service activity. It is situated in an urban situation already formed and a more determinant masshtab. The average height of floors in this segment is the 2nd floor.
By urban object is not in harmony with the buildings for - around, creating an aesthetic and functional abnormalities.
On the subject construction of the system is presented as a constructive combination with retaining walls and beam-column system. As a result of this combination have emerged inevitably cracking walls and soletes. Also worth to be mentioned and degradation limit that has been building as a result of the poor quality of construction materials and atmospheric agents.

For the above reasons pemendura this facility will be undergoing emergency reconstruction and also will build an additional floor.
Interference reconstruction will be in the foreground reinforcement and constructive disposition of the system as a whole and of all the walls sistemimen interfering strong mound parameters moisture and improve hygiene and sanitation.
By architectural will be regulating facade creating a new architectural design with glass as structural elements, alukobondi or ceramic tiles.


The project foresees a further reduction of the actual floor to quota -0.80 for two reasons. We primarily have intervened from the floor primers to avoid the excess moisture that is in these environments and to create holes in the skirting opening of new columns that will be constructed.
It is necessary to intervene to ensure that the system constructive arranged into system tra-column, adding columns to new in existing walls, to arrive at a reinforcement as the best of the foundations current and to enhance seal in order to support them construction of a new floor.


Facility designed to comply with all parameters set forth in the law of urban planning and urban regulation.
Arkitekura and functional solution of the building was based on the requirements of the investor and the technical references to the type of activity that will take place in. It has linear development, form the basis of existing technological line. The maximum height is 7,35m quota of 0.00. Building on the part of the main road there will be a decrease of 80cm, entrance stairs foreseen to be realized. While at the rear of the building 0:00 quota will be equal to the quota adjustments.
The layout of the building is simple, clean place with 15m long, which will serve for storage and commercial activity.

 

 

Access to the building is provided with a gate with two leaves, the gate is the face of the way in order to have a better access for service. At the bottom of the site plan of the construction project foresees the construction of a freight elevator, which establishes links between the ground floor and first floor. The new floor was added to respect the existing floor gabarite Lighting of the premises carried out by road through the pages with structural glass. Coverage is provided by SOLETE monolithic.
The exterior finishes gray tiles containing dark
(Or alukobond) combined with structural glass and the rest will be painted white plaster.
Architectural appearance of the building is foreseen to give a feeling of horizontalitetit, this is achieved by mounting the plate in horizontal stretch.